Tuesday, 15 September 2015

New Accomplishments

What a day!!! Full of different accomplishments for me today. If you were un aware, I have picked up a new project for a Honda SL 100. Needs to be fully stripped down and completely re-newed. Has taken me awhile but I have finally gotten the whole frame stripped down. Engine out and everything. Now just needs to be categorized into different boxes to get sent out and get her make over. Very excited to get everything back.

Of course with every project, there was some bumps in the road. Trying to figure out what to take off. And in what order. Especially since its an older bike there's some rust, making things a little more difficult than they should be but I always work my way through it and manage to get everything off. With some help from the boss man if needed.

Oh and of course its not a proper work day without getting injured. I managed to get my finger a nice shade of purple today. And bent a nice screw driver from getting it stuck while I was trying to get the swing arm off. Thank god I have a boss that laughs more than anything. We were able to get it somewhat straight after haha.

 
Over all it has been a very fun and productive day. As it always is here. Never a dull moment in this shop. Which is one of the many reasons why this is my second home.

Friday, 11 September 2015

Nicki's Triumph

Hailing from Norway, photographer extraordinaire Nicki Twang   http://www.nickitwang.com  contacted us to see if we could help him out with his 67 Triumph tr6 with a disc style T140 front end. As usual we took on the challenge and with input from Nicki this is what we came up with. Clean and simple!





Wednesday, 9 September 2015

GSXR To CB Conversion

I'll start stocking GSXR To CB Conversion triples. Did a couple for customer builds and patterned this custom triple to use a  2007 GSXR1000 setup with a 50mm offset. The stock stem can be modified and reused. Top clamp is 1" thick while the bottom is 1.5" for the beefy look!